Master Bath

This project was a complete overhaul of a master bath in a 20yo model home in Lockport. Day 1 began with bringing everything back down to the studs to assess. From there, all plumbing was brought up to code and made to accommodate a new double bowl vanity. All of the electric was completely re-done to allow additional can lighting and gfci outlets. A complete kerdi shower system with linear drain was installed, seams waterproofed and drain/pan 24hr leak tested. From there the finishing touches began, turning our customers vision into a reality!