Two walls removed that separated the kitchen from the dining room and living room. New Fiberglass Pella windows were installed with new exterior siding. Size of one window altered for Cabinets and CT. New flooring throughout the first floor along with paint and New Pex Pipe throughout the home for a total repipe .